The progress node, built in public.
The status board is hand-asserted, never scraped. The log below is the reverse-chronological record of what changed and why.
functionally complete; closure gated on the manual end-to-end test
- Filesbuilt
- Emailbuilt
- Packagesplanned
- Browserplanned
- Clipboardplanned
THE LOG
Phase
Status
JUNE 2026
phase-1 · email-scanner · 2026-06-25
Reading mail without touching it
Two-phase IMAP fetch: BODYSTRUCTURE first, then only the text parts, read-only via BODY.PEEK, with hard size caps.
research · gate-2-classifier · 2026-06-16
XGBoost sets the bar at 97.78 — on validation
XGBoost on 2381 EMBER features: 97.78% validation accuracy, 0.98 F1. CNN and fusion pending. Test set stays locked.
phase-1 · daemon · 2026-06-09
The daemon stands up
ArgusDaemon built: one processor thread routes watcher and scanner events through the gate pipeline. Five smoke tests pass.